SAP Calculations in London

We are established, fully accredited assessors and have been conducting SAP calculations across Britain for many years.

Our team is ready to help you achieve the results you desire with your new property, conversion or extension. Simply, get in touch.

    What are SAP Calculations?

    SAP Calculations are essential for any building to be listed on the market. According to Part L of the Building Regulations, SAP tests need to be conducted on all new residential developments, as well as extensions and conversions. There are two types of SAP calculations, these are:

    • L1A SAP – for new building developments
    • L1B SAP – for extensions and conversions only

    Both types of tests will be issued a score between 1 and 100. The higher the score, the lower the energy running cost of the dwelling.

    SAP Calculations in London

    There has been a tightening of CO2 emission targets across the construction industry in recent years. As such, it’s become much more difficult to achieve the standards required to pass SAP tests. Fortunately for Purple Energy clients, we have been in the business for years and have seen first-hand the changing regulations.

    For the best chance of achieving the results you want in your SAP calculations, we’d strongly advise getting in touch and involving us in the process as early as possible. We have a long list of London-based customers who can vouch for our work.

    How long do they take?

    Ordinarily, SAP calculations take around 48-hours once we’ve received the order. However, each project is unique, with timescales based on the type of building and the timeline of the client’s project. Once the assessment process is completed, we will issue your report, which should arrive within 5-10 working days based on standard UKBC times.

    Experienced SAP Assessors in London

    London is very much the heartbeat of the country and an area that is constantly under development. Despite the fact it’s a 2-hour drive from our headquarters, we’ve frequently been making the trip South in the last couple of years. Our team is well-acquainted with the area, as we’ve worked hard to build our network in the Borough of London.

    Frequently Asked Questions

    Drawing up a quota for SAP calculations varies depending on the type of building. We strive to provide an affordable service and will do all we can to ensure our high-quality standards to clients who have been offered a cheaper quote elsewhere.

    To get the process underway, we’ll first need to look at your project plans and then we’ll get a quote sent over as soon as possible. 


    Generally speaking, the turnaround time for a standard SAP calculation is 48 hours, with an additional 5-10 days for the report to be issued. Our times are based on standard UKBC times.

    However, each project is different and timescales depend on the location and on the size of the property, which means the standard 48 hour time period can be extended. Be assured that our team will work tirelessly to get things over the line in a timely fashion.

    Passing a SAP calculation requires applicants to meet various standards across a range of aspects of building and construction. These include the following:

    • Type of building materials and thermal insulation used to construct the dwelling
    • Ventilation Test and
    • Air Tightness Testing results
    • Method of heating water and preference of space, ventilation and lighting
    • Solar Gains
    • Productivity and control of the heating system
    • Instalment of renewable energy technologies e.g. thermal heat pumps, solar panels

     